Expertise in innovative road and rail infrastructure
Call us +44 (0) 1275 818008

Crown PTZ Dual Unit enabled CCTV Mast

Crown PTZ Dual Unit enabled CCTV Mast

  • Provides integrated cable management
  • Provides true single person operation
  • Provides Dual Unit capability
  • Integrated winch - tuned to lowering weight

Latest News

Crown showcases clean air innovations at Highways UK Smart city road and rail safety manufacturer Crown International will showcase its new range of air-quality improvement infrastructure at this year’s Highways UK show (Stand...

(more...)

Crown International wins £352,000 Balfour Beatty and VINCI contract Crown International has secured a £352,000 contract with Balfour Beatty and VINCI Construction Grands Projects to supply and install Variable Height Dual Unit Enabled PTZ (Pan-Tilt-Zoom)...

(more...)

Crown launches double EV Charge Point

Smart city road and rail safety manufacturer, Crown International, launches its latest cost-saving innovation, a double EV Charge Point offering a seamless kerb-side...

(more...)

Crown International’s Variable Height Dual Unit Enabled PTZ Mast has been designed and built as an improvement on existing PTZ platforms combining true single operation, an in-board braking system, integrated cable management and the capability of mounting additional equipment to support lane monitoring cameras.

The design has several unique features and will provide greater reliability of operation. A winch is fully integrated into the pole and the integrated cable management means that all cables can remain in place when the platform is lowered or raised. Like other Crown International products this makes the pole a true single person operation thereby reducing operating costs.

The pole can be made in variable heights and can be deployed onto concrete and screw pile foundations. It is currently in deployment across a number of Smart Motorways Schemes in the UK.